Application of BIM Based Information Management Technology in Prefabricated Buildings

Main Article Content

Shen Tong
Yu Nan

Abstract

Under the background of industrial transformation and green development of construction industry, prefabricated building has become an important means to promote the development of construction industrialization and environmental protection. In the period of new and old construction mode change, the construction links of in-depth design, component production, component transportation and assembly construction are added to the prefabricated building, which has higher requirements for the unity of the whole process of the construction project. BIM platform can unify the information of the whole process and coordinate the management of the whole process of the project. This paper expounds the application of information management technology based on BIM in the three processes of in-depth design, component production and transportation management of prefabricated building. Through the analysis and comparison of actual cases, it is concluded that the prefabricated building combined with BIM Technology has more advantages than traditional construction in design, management, capital, environmental protection, etc.

Keywords:
Prefabricated building, information management, transportation management, BIM technology.

Article Details

How to Cite
Tong, S., & Nan, Y. (2020). Application of BIM Based Information Management Technology in Prefabricated Buildings. Journal of Scientific Research and Reports, 26(12), 17-29. https://doi.org/10.9734/jsrr/2021/v26i1230337
Section
Short Research Article

References

Technology and industrialization development center of Ministry of housing and urban rural development. Development report of prefabricated building in China [M]. Bei Jing: China Architecture and Building Press; 2017.

Zhang Hao, CHEN Zhenhai. Application and analysis of two-dimensional code technology based on bim in the whole process of assembled prefabricated components [J]. Construction Technique, (Supplement). 2019;48:347-350.
DOI: CNKI:SUN:SGJS.0.2019-S1-089

Wei Dong quan. Research on Production management system of pc factory based on BIM [J]. Construction Economy. 2020;41(2):25-29.
DOI:10.14181/j.cnki.1002-851x.202002025

Chen Min. Informationized management for prefabricated building project based on BIM [J]. Building Construction. 2018;40(60):1051-1052.
DOI:10.14144/j.cnki.jzsg.2018.06.078

ZHANG Zhong-hua, SUN Hui, LIU Ying, FENG Wei-dong, XIAO Yi. Exploration and practice of information management in prefabricated buildings [J]. Journal of Engineering Management. 2018;32(3):47-52.
DOI:10.13991/j.cnki.jem.2018.03.009

LI Min, LI Qilian, An Pengfei. Reasearch on the application of BIM based assembly intelligent management platform [J]. Application of Integrated Circuit. 2018;35(10):78-8.
DOI:10.19339/j.issn.1674-2583.2018.10.022

BAI Shu, ZHANG Yankun, HAN Feng, ZHANG Dehai, LI Wei. Analysis on the application value of bim technology in prefabri cated building [J]. Construction Economy. 2015,36(11):106-109.
DOI:10.14181/j.cnki.1002-851x.201511106

TANG Xiao-ya, CUI Shi-b, XU Peng-peng, FU Yan. Inspiration and thinking of domestic logistics dispatching research on logistics scheduling of prefabricated building components [J]. Journal of Engineering Management. 2019;33(2):25-29.
DOI:10.13991/j.cnki.jem.2019.02.005.

CHANG Chunguang, WU Feifei. Prefabricated construction rocess management based on bim and rfid technology [J]. Journal of Shenyang Jianzhu University (Social Science). 2015;17(2):170-174.
DOI:10.11717/j.issn.1673-1387.2015.02.12

YE Hao-wen, ZHOU Chong, WANG Bing. Promoting the development of assembly building with epc mode [J]. Journal of Engineering Management. 2017;31(2):17-22.
DOI:10.13991/j.cnki.jem.2017.02.004

Wang Chang-sheng, LAN Jie. Application research of BIM technology in construction of assembly construction engineering [J]. BIM Technology. 2020;07(027).
DOI:10.13655/j.cnki.ibci.2020.07.027

SHEN Jinshan, HUA Yuanpu, YUAN Ming. Research on lean cost management of prefabricated buildings [J]. Construction Economy. 2019;40(3):45-49.
DOI:10.14181/j.cnki.1002-851x.201903045

LIU Kang-ning, ZHANG Shou-jian, SU Yi-kun. Review on management topics of prefabricated construction building [J]. Journal of Civil Engineering and Management. 2018;35(6):163-177.
DOI:10.13579/j.cnki.2095-0985.2018.06.055